A. A. Ageev and A. E. Baburin, Approximation algorithms for UET scheduling problems with exact delays, Operations Research Letters, vol.35, issue.4, pp.533-540, 2007.
DOI : 10.1016/j.orl.2006.09.006

D. Ahr, J. Békési, G. Galambos, M. Oswald, and G. Reinelt, An exact algorithm for scheduling identical coupled tasks, Mathematical Methods of Operations Research (ZOR), vol.59, issue.2, pp.193-203, 2004.
DOI : 10.1007/s001860300328

J. Bla?-zewicz, K. Ecker, T. Kis, C. Potts, M. Tanas et al., Scheduling of coupled tasks with unit processing times, 2009.

N. Brauner, G. Finke, V. Lehoux-lebacque, C. Potts, and J. Whitehead, Scheduling of coupled tasks and one-machine no-wait robotic cells, Computers & Operations Research, vol.36, issue.2, pp.301-307, 2009.
DOI : 10.1016/j.cor.2007.10.003

URL : https://hal.archives-ouvertes.fr/hal-00180401

J. Edmonds, Maximum matching and a polyhedron with 0,1-vertices, Journal of Research of the National Bureau of Standards Section B Mathematics and Mathematical Physics, vol.69, issue.1 and 2, pp.125-130, 1965.
DOI : 10.6028/jres.069B.013

H. N. Gabow, An Efficient Implementation of Edmonds' Algorithm for Maximum Matching on Graphs, Journal of the ACM, vol.23, issue.2, pp.221-234, 1976.
DOI : 10.1145/321941.321942

M. R. Garey, J. , and D. S. , Computers and Intractability: A guide to the theory of NP-completeness, 1979.

R. Graham, E. Lawler, J. Lenstra, and A. R. Kan, Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey, Annals of Discrete Mathematics, vol.5, pp.287-326, 1979.
DOI : 10.1016/S0167-5060(08)70356-X

A. Orman and C. Potts, On the complexity of coupled-task scheduling, Discrete Applied Mathematics, vol.72, issue.1-2, pp.141-154, 1997.
DOI : 10.1016/S0166-218X(96)00041-8

A. J. Orman, C. Potts, A. K. Shahani, and A. R. Moore, Scheduling for a multifunction phased array radar system, European Journal of Operational Research, vol.90, issue.1, pp.13-25, 1996.
DOI : 10.1016/0377-2217(95)00307-X

A. J. Orman, A. K. Shahani, and A. R. Moore, Modelling for the control of a complex radar system, Computers & Operations Research, vol.25, issue.3, pp.239-249, 1998.
DOI : 10.1016/S0305-0548(97)00047-6

R. Shapiro, Scheduling coupled tasks, Naval Research Logistics Quarterly, vol.12, issue.3, pp.477-481, 1980.
DOI : 10.1002/nav.3800270312

H. D. Sherali and J. C. Smith, Interleaving two-phased jobs on a single machine, Discrete Optimization, vol.2, issue.4, pp.348-361, 2005.
DOI : 10.1016/j.disopt.2005.08.002

G. Simonin, B. Darties, R. Giroudeau, J. König, R. Giroudeau et al., Isomorphic coupled-task scheduling problem with compatibility constraints on a single processor Polynomial-time algorithms for scheduling problem for coupled-tasks in presence of treatment tasks, To appear in Journal of Scheduling. Simonin, G Electronic Notes in Discrete Mathematics, vol.32, pp.647-654, 2010.